by Groppo Australia | 29 May, 2018 | Flight Controls, General
Step 5 Tools Required: Metric spanners Allen Keys Metric sockets Files Drill Counter sinker Step 5 is when the toe brakes were fitted to the rudder pedals (rear toe brakes optional) This step is basic to follow in the manual and as in previous steps, we...
by Groppo Australia | 27 Nov, 2017 | Flight Controls
Step 4 Required Equipment Metric spanners Allen keys Metric sockets Files Rivnut tool Step 4 entails the assembly and installation of the rudder control pedals. This step is quite a basic step but did require some very minor modification to some of the parts,...
by Groppo Australia | 14 Sep, 2017 | Flight Controls
Required Equipment metric spanners/ sockets files nylon/rubber mallet pneumatic rotary burr de-burring tool In the Groppo Trail Construction Manual (GTCM), Step 2 covers the assembly and installation of the flight control sticks. This includes both sticks and...
by Groppo Australia | 16 Jul, 2017 | Flight Controls
Required Equipment- (aside from basic hand tools) Drill and metric drill bits Sandpaper and/or linisher Rivnut insertion tool In the construction manual, Step 1 involves fitting some of the aileron controls. This step is a little preemptive, as will be seen in...
Recent Comments