Step 5: Toe Brakes

Step 5 Tools Required: Metric spanners Allen Keys Metric sockets Files Drill Counter sinker     Step 5 is when the toe brakes were fitted to the rudder pedals (rear toe brakes optional) This step is basic to follow in the manual and as in previous steps, we...

Step 4: Rudder Control Pedals

Step 4 Required Equipment Metric spanners Allen keys Metric sockets Files Rivnut tool   Step 4 entails the assembly and installation of the rudder control pedals. This step is quite a basic step but did require some very minor modification to some of the parts,...

Step 3: Floor Panel

Step 3 Required Equipment Drill Rivet Gun Files De-Burring Tool Cleco Pins Sharpie (Marker) Cleco Clamps Cleco Pliers Step 3 involves attaching the floor panel to the steel frame and is really the first of the permanent attachment steps, so care should be taken to...

Step 1: Aileron Controls

Required Equipment- (aside from basic hand tools) Drill and metric drill bits Sandpaper and/or linisher Rivnut insertion tool   In the construction manual, Step 1 involves fitting some of the aileron controls. This step is a little preemptive, as will be seen in...